Chapter 20. The Final Chapter???
When I started this blog I had no real idea how long it
would run, partly because I was unsure how long the build of my BSA B31-2 would
take, but mainly that it was impossible to tell when Brooklands would open again.
I decided in any case to keep it going at least to the latter occasion.
As I write this I can say that the Marge is essentially
complete, albeit with a fairly healthy “punch” list of items to take care of. Also I have now completed more than a week’s worth of Brooklands visits, one day
as a gardener, an induction day, the public opening day on 2nd
August, Sunday helping out with the demonstration runs and today on the
maintenance crew. I know it will take quite a while before we can all get together
as the Motor Cycle Team on the same day, but let’s hope it’s not too far away.
The last week’s build has been quite frantic in some ways,
with some jobs going really well and others taking much longer than expected. I
spent quite a while designing and fabricating a clamp system to hold the
battery but the space was just too cramped so I’ll wedge it in place with foam
rubber. The brake return springs I got from Feked were both wrong – my fault
not theirs – so I ended up using the back one at the front and vice versa. I now have a minimalist wiring loom, from the battery via a small switch and fuse, to
the coil, with an Optimate charging plug which will be hidden under the seat. I
even fitted a black knob to my improvised gear-lever, sourced from the pre-war
BSA aisle at B&Q. It must look OK as my brother said “is that the original gear
lever”.
By Monday evening I realised I was dreaming up little jobs
to avoid that heart stopping moment of trying to start it up – not strictly for
the first time, but certainly in its completed form. I arranged for my brother
to come round to provide assistance the next morning and typed out a check-list
– knowing very well that its easy for forget things like filling it up with
oil. By mid-Tuesday morning Alan still hadn’t arrived, in fact he’d run out of petrol
and was pushing his Royal Enfield though Chessington, so I set of pushing Marge down
the garden on my own. First time! Off it went!! Check the oil tell-tale plunger
– a bit too much pressure, but there’s a regulator valve for adjustment. Gears
wouldn’t select very easily but leaving it in 2nd I completed a couple
of “sighting laps” of the garden.
I made a note of all the settings, the bars and twist grip
had come loose but apart from that all the other fasteners were tight. I have
mainly been concerned about the mainshaft nut as I’ve been unable to incorporate
a tab lock washer and am relying on Loctite and a torque wrench.
When my brother finally arrived we had it running again and managed
the photo above before we decided that the neighbour’s nostalgia for pre-war motorbikes
might be wearing a bit thin. By then the clutch adjusting screw had also come out
and is now lying in wait for the next time I cut the grass, so we called it a
day.
The only significant issue with the BSA is that as I opened
up the throttle it died a fair bit. If I dropped the air-slide it was far
better, which tends to suggest its over-carburated and / or running too lean. I’ve
mentioned before that the carb is a 1” Amal 276, whereas the original bike
would have had a 7/8” device. There are a few things I can try before changing
the carb; raising the needle a notch or two or perhaps a lower slide cut-away.
Prior to making some Brooklands cans – another Phase 2 job – I might fit some rudimentary
exhaust baffles as it is quite noisy and this should also have the effect of
making it run a bit richer. In practice the only way I can really make progress
is my running it on the road or track, so to this end I’m hoping that in a
couple of weeks I could perhaps bring it into Brooklands on one of the
maintenance days.
On that note I had a thoroughly enjoyable time today with
Martin and Fred where we had the Cotton-Earl Jap out for a quick check over and
start-up. You may have already seen the Volunteer newsletter or Martin’s email,
about the film crew coming in. They were there today for a look around and were
able to see first-hand that out team rolls its sleeves up and gets their hands oily.
This is not quite the end of my blog as I intend to publish
a post-script or two as and when Marge has had a chance to stretch her legs and
show us what she’s made of. In the meantime I’m really looking forward to the
next couple of months running demos and the maintenance days in between and hopefully
getting back to a least some kind of normality.
Keep well and stay safe
Gareth

Comments